  1. [2023] NZEnvC 155 Genesis Energy Limited v Waikato District Council [pdf, 413 KB]

    ...Waikato District Plan (PDP) in relation to Table 25 in APP1 which requires residential units and other buildings containing sensitive land uses within 350m of the Huntly Power Station site boundary to be insulated to achieve a specified internal design sound level. [2] This determination resolves the appeal in part. Background [3] Genesis Energy Limited (Genesis) owns and operates the Huntly Power Station. Original submission and PDP decision [4] Genesis made a submission and...

  2. Southern Lakes Holdings Ltd – memo – proposed changes to PC7 (4 Feb 2021) [pdf, 153 KB]

    BEFORE THE ENVIRONMENTAL COURT CHRISTCHURCH REGISTRY ENV:2020-CHC-2017 In the Matter of the Resource Management Act 1991 And a notice of motion under Section 149T(2) to decide proposed Plan Change 7 to the Regional Plan: Water for Otago. Between OTAGO REGIONAL COUNCIL Applicant And SOUTHERN LAKES HOLDINGS LTD Section 274 Party MEMORANDUM FOR SOUTHERN LAKES HOLDINGS LTD (SLH) SETTING OUT CHANGES PROPOSED TO PC7’S PROVISIONS...

  3. HortNZ - EiC - M K Sands - Industry (5 Feb 2021) [pdf, 313 KB]

    ...transitional nature of PC7, which means that deemed permit and water permit renewal applications to transition to horticulture or to invest in horticultural expansion, are likely to be non-complying activities. 5. It is critical that policies designed to ring-fence the renewal of existing deemed permits and water permits under the controlled activity pathway, do not inadvertently prevent the granting of water permits that could result in lesser environmental effects and generat...

  4. 6_WK-response-to-District-Councils-request-for-information-under-section-92-Final-v2.pdf [pdf, 5.2 MB]

    ...of the Resource Management Act 1991 This letter provides a response to the request for further information pursuant to section 92 of the Resource Management Act 1991 (“RMA”) received on [add date] in relation to the notices of requirement for designations (“NoR”)1 to authorise the Ōtaki to north of Levin Highway Project (“Ō2NL Project” or “the Project”) The information requested and the Waka Kotahi NZ Transport Agency (“Waka Kotahi”) response is set out in the...

  5. 13-ESCP-Plans.pdf [pdf, 3.6 MB]

    ...Installation of the erosion and sediment control measures. Ø General earthworks and civil works generally comprising material borrow site, roading and drainage. Ø Site stabilisation. The proposed erosion and sediment control (ESC) measures have been designed in accordance with the Projects ESCP. This ESCP is supported by the following reference drawings provided in Appendix B: ESCP-004 1.2 Construction Methodology } Prior to the commencement of any works the Project Engine...

  6. ENVC Hearing 6Oct14 WML evidence chief Brett Black [pdf, 58 KB]

    ...prepared by Wardale Marine industry Consulting. 18. The predicted lowest sea water level is at +0.0m CD for Lowest Astronomical Tide. This lowest sea level governs the stability of the breakwaters during their construction and during their design working life due to the reduced buttressing effects on the breakwater and toe of the seabed. 19. The stability and geometry of the primary breakwater is also anticipated to be strongly affected by the presence of the soft marin...

  7. 29a.-Appendix-A-to-the-Evidence-of-Ms-McLeod-O2NL-Conditions-Evidence-Version-Tracked.pdf [pdf, 2.4 MB]

    ...Construction footprint The area in the Project Area within which construction activities occur. Contaminated land For the purpose of Condition RSW1, a piece of land described in subclause (7) or (8) of the Resource Management (National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health) Regulations 2011 The term is added as a consequence of an amendment to Condition RSW1. Detailed site investigation Has the same meaning...

  8. Fish & Game - EiC - J W Hayes - Ecological Flow (5 Feb 2021) [pdf, 1.6 MB]

    ............................................................................... 8 The minimum flow and allocation rate: how they interact to affect instream life ........................................................................................... 8 Assessing environmental effects with respect to provisions of environmental law and policy ................................................................ 9 Values- and risk-based framework for guiding environmental flow limits setting...

  9. ENVC Hearing 6Oct14 TGKL lay [pdf, 1.1 MB]

    ...berth is still owned by the family. Thomas has dived both of these marinas on retrieval missions for items lost overboard. 5. Kristin has a Bachelor of Science (BSc) from Waikato University. She spent two years at Auckland University studying Environmental Management and the remainder of her degree studying at Waikato University in the fields of coastal and freshwater ecology / management and geology. She has worked at Auckland Regional Council and Auckland City Council under contrac...

  10. ENVC Hearing 6Oct14 TGKL lay attach 10 substitute [pdf, 935 KB]

    ...berth is still owned by the family. Thomas has dived both of these marinas on retrieval missions for items lost overboard. 5. Kristin has a Bachelor of Science (BSc) from Waikato University. She spent two years at Auckland University studying Environmental Management and the remainder of her degree studying at Waikato University in the fields of coastal and freshwater ecology / management and geology. She has worked at Auckland Regional Council and Auckland City Council under contrac...