[2024] NZEnvC 221 Connor [pdf, 330 KB]
...new resource consent. For the avoidance of doubt, these conditions have been provided on an Augier basis and further to s108AA(1)(a) of the RMA. Construction noise limits 15. Construction works on the site authorised by this consent must be designed and conducted to not exceed the noise levels specified in AUP (OP) E25.6.27 subject to E25.6.27 (4) where levels are decreased by 5 dB, when measured 1m from any building that is occupied during the works. Noise from construction work a...